logo
products

Staircase Crystal Candle Chandelier Vertical Cascade Stairwell Pendant Fixture Installation

Basic Information
Place of Origin: Guangdong, China
Brand Name: Pendantschandelier
Certification: CE, RoHS, ISO 9001:2015
Model Number: RC-604
Minimum Order Quantity: 1 Piece
Price: USD 180-3800 / Piece
Packaging Details: Foam blocked plywood crates, padded crystal trays by tier, labelled hardware boxes with assembly drawings
Delivery Time: 20-42 days after drawing approval
Payment Terms: T/T, L/C at sight, Western Union
Supply Ability: 300 Pieces per Month
Detail Information
Material: Brass Plated Steel, Brass Arms, K9 Crystal Voltage: 220-240V
Light Source: E14 LED Candle 2700K Diameter: 500-1200mm
Drop: 3000-10000mm Clearance: Verified Per Landing
Finish: Antique Brass, Gold, Bronze, Satin Nickel Lead Time: 28-38 Days
Warranty: 3 Years
Highlight:

Staircase crystal candle chandelier

,

Vertical cascade stairwell pendant fixture

,

Restaurant chandelier installation


Product Description

Stairwell chandeliers fail in a predictable way: they look correct on a drawing and then crowd the handrail as built, or the bottom section hangs too low from the top landing view. This staircase crystal candle chandelier is planned against the actual stair geometry, with clearance verified level by level and cascade sections cut to the landing heights. The candle arms give the fixture a formal reference that suits heritage interiors, and the vertical cascade carries the eye up through the void. Total drop can reach ten metres, and the fixture is assembled in sections so it can be hung as the staircase is completed rather than blocking handover. Wire core strands and lock wire drops keep the lines straight over a long drop, where softer materials stretch and the cascade loses its rhythm within a season.

Key Features
  • Level By Level Clearance: Clearance is verified against each landing and the handrail profile, avoiding the as built crowding that appears when a fixture is drawn only in elevation
  • Sectional Cascade Build: Sections are cut to landing heights and installed progressively as the staircase is completed, so the fixture does not block project handover
  • Candle Arm Formality: Candle arms give a formal reference that suits heritage stairwells, listed buildings and traditional hotel interiors without looking out of period
  • Lock Wire Drop Fixing: Drops are held on lock wire hooks that stay in position over a ten metre drop, where softer fixings gradually sag and break the cascade rhythm
  • Ten Metre Drop Capability: Sectional construction supports drops up to ten metres, covering hotel cores, mansion stairwells and church towers without site splicing
  • Two Point Suspension: Twin rated anchors share the load, keeping the fixture stable where a single point would twist the cascade out of alignment
Technical Specifications
ParameterSpecification
ModelRC-604
Voltage220-240V, 50/60Hz
Light SourceE14 LED candle, 2700K
FrameBrass plated steel with brass arms
CrystalK9 drops with cascade strands
Diameter500mm to 1200mm
Drop3000mm to 10000mm
ClearanceModelled per landing and handrail
FinishAntique brass, polished gold, bronze, satin nickel
Warranty3 years on frame, 2 years on electrical
Applications

Specified for hotel staircases, mansion and villa stairwells, church towers, heritage building cores and gallery landings. The candle form suits period interiors, while the cascade arrangement keeps the fixture visually interesting across several storeys. Hotels also use a shorter version in service stairwells with a darker finish to keep the fixture recessive in staff areas.

Customization Process

We work from stair dimensions, handrail drawings and landing heights, then model the fixture against the full stair and issue a clearance drawing for sign off. Options include an offset canopy for spiral stairs, a lowering winch, a two tone finish, and multiple cascades in one stairwell matched in design.

Packaging and Quality Assurance

Cascade sections ship as pre labelled bundles in individual sleeves on rigid formers, and frames travel in foam blocked crates. A section card matched to the clearance drawing lets the installer hang in sequence rather than test fitting at height.

Service and Delivery

Lead time is 28 to 38 days after approval, with staged delivery aligned to stair completion. A three percent strand allowance and replacement drop sets are included, winch hardware is stocked where specified, and video support covers section sequencing and final alignment.

Contact Details
Elina Tang

Phone Number : +86 13715662372

WhatsAPP : +8613715662372