logo
products

Custom Designed Pendant Light Restaurant Ceiling Fixture Project Batch Production Run

Basic Information
Place of Origin: Guangdong, China
Brand Name: Pendantschandelier
Certification: CE, RoHS, ISO 9001:2015
Model Number: RC-506
Minimum Order Quantity: 20 Pieces for wholesale orders, 1 Piece for samples
Price: USD 95-2600 / Piece
Packaging Details: Foam blocked plywood crates, padded crystal trays, customer branded cartons available, container planned loading
Delivery Time: 20-36 days after drawing or sample approval
Payment Terms: T/T, L/C at sight, Western Union, trade assurance
Supply Ability: 20000 Pieces per Month
Detail Information
Material: Brass Plated Steel, Brass Tube, K9 Crystal Voltage: 220-240V Or 110V
Light Source: E14 LED Candle Or Integrated LED Batch Size: 10-400 Units
Diameters: 400-1600mm Drop: 600-4000mm Per Position
Finish: Matched Within Batch Lead Time: 24-34 Days
Warranty: 2 Years
Highlight:

Custom Pendant Light Restaurant Fixture

,

Restaurant Ceiling Chandelier Batch Production

,

Custom Designed Restaurant Chandelier Project


Product Description

A restaurant project rarely needs one fixture, it needs a batch that hangs together: dining room chandeliers, bar pendants and corridor lights that share a design language and arrive labelled per room. This custom designed pendant light is supplied as a project batch, produced against a schedule that lists every position, every drop length and every finish, with each unit marked for the room it belongs to. That single change removes the most common site problem in restaurant fit out: an installer opening crates to find four different drop lengths and no way to tell which goes where. Batch production also lets a designer specify small variations within one order, such as a longer drop in the double height entrance and a shorter version over the bar, without a second tooling cycle or a separate lead time.

Key Features
  • Position By Position Schedule: Production follows a schedule listing every position, drop and finish, so the batch arrives as a system rather than a pile of similar fixtures
  • Room Level Labelling: Each unit is marked for the room it serves, removing the site problem of opening crates to find mixed drop lengths with no identification
  • Variations Within One Batch: Drop, diameter and finish can vary across positions in a single order, avoiding a second tooling cycle or a separate lead time for special areas
  • Batch Consistency: Plating and crystal come from a single batch for the whole order, so fixtures in adjacent rooms do not show a shade difference under restaurant lighting
  • Installer Friendly Documentation: A schedule with photographs, hardware lists per position and anchor details ships with the batch, reducing questions during installation
  • Change Window Before Cutting: Schedule changes are accepted until the cutting release date, which suits restaurant projects where the layout firms up late in the fit out
Technical Specifications
ParameterSpecification
ModelRC-506
Voltage220-240V, 50/60Hz or 110V
Light SourceE14 LED candle or integrated LED
FrameBrass plated steel, brass tube
CrystalK9 drops or glass strands
Diameters400mm to 1600mm per position
Drop600mm to 4000mm per position
Batch Size10 units to 400 units
FinishPer position schedule, matched within batch
Warranty2 years on frame and electrical parts
Applications

Used for restaurant fit out where several rooms need coordinated fixtures, and for hotel restaurant projects with dining, bar and private rooms in one contract. The batch format also suits clubs, members bars and retail hospitality areas where a single order covers multiple spaces, and it works well for projects with a late layout freeze because the schedule can be adjusted until cutting release.

Customization Process

We issue a position schedule template that the designer or contractor fills in, then return a consolidated quotation with per position pricing. Options include mixed fixture types within one batch, a single finish across all positions for a uniform look, a staged delivery per room ready date, and consolidated crates per floor or per area.

Packaging and Quality Assurance

Units are packed by area or room group, with each carton labelled to the schedule position and a packing list per crate. Crystal travels in labelled trays matched to the unit number. Hardware per position travels with its unit, so an installer opens one carton and has everything needed for that position.

Service and Delivery

Lead time is 24 to 34 days after schedule confirmation, with changes accepted until cutting release. A spare allowance of three percent is included across the batch, and the position schedule is retained for five years so additional units can be matched for later phases or refurbishments.

Contact Details
Elina Tang

Phone Number : +86 13715662372

WhatsAPP : +8613715662372